Cement and sand, or bags of ready-mix, for a floor screed or mortar bed.

A screed (mortar bed) levels the slab before tile, vinyl or laminate. Its volume is the area times the thickness; the mix ratio says how much of it is cement and how much is sand.

The calculator gives both options: mixing cement and sand on site, and buying bagged ready-mix screed.

How to use

  1. Enter the floor area.
  2. Type the average thickness. Measure the low and high points if the slab isn't level.
  3. Choose the mix: 1:3 is stronger, 1:4 is the usual floor screed, 1:5 for thick fills.
  4. Read the cement, sand and ready-mix bags.

Cement and sand per cu yd of screed

MixCement per cu yd94 lb bags per cu ydSand per cu ydCement for 100 sq ft × 2 in
1:3950 lb10.11.25 cu yd586 lb
1:4777 lb8.31.37 cu yd480 lb
1:5642 lb6.81.41 cu yd396 lb

From the Brazilian SINAPI cost tables (cement:sand by volume, damp sand). Without waste.

How thick should a screed be?

Bonded to the slab: from about 3/4 in (2 cm). Unbonded or floating over insulation: at least 1 3/4 to 2 in (4.5 to 5 cm). Very thin layers crack; for less than 3/4 in, use a self-leveling underlayment instead.

Ready-mix bags

Bagged screed weighs about 20 kg per m² for each cm of thickness (Würth and Baumit data sheets), roughly 4 lb per sq ft per inch. An 80 lb bag covers about 3.8 sq ft at 2 in.

Where the numbers come from

Coverage and consumption figures come from manufacturer data sheets and published standards:

Frequently asked questions

How much cement do I need for a floor screed?

For a 1:4 mix, about 460 kg of cement per m³ (775 lb per cubic yard). A 10 m² floor 5 cm thick (0.5 m³) needs about 230 kg.

What is the best mix ratio for floor screed?

1:4 cement to sand is the usual choice. 1:3 for thin or heavily loaded screeds, 1:5 for thick fills that won't take much load.

How many bags of screed for 100 sq ft?

At 2 in thick, about 26 bags of 80 lb (29 with 10% waste), using 20 kg per m² per cm.

How long before I can tile on a screed?

A cement screed needs about a week per inch of thickness to dry under normal conditions; follow the product's instructions for ready-mixes.